Muon Accelerator Program (MAP)

U.S. Department of Energy

Document List by Topic

These documents on Targetry are available:

MAP-doc-# Title Author(s) Topic(s) Last Updated
4412-v1 The Target System Baseline Harold G Kirk Targetry
11 Oct 2017
4370-v1 INFLUENCE OF PROTON BEAM EMITTANCES ON PARTICLE PRODUCTION OFF A MUON COLLIDER TARGET Xiaoping Ding Targetry
28 Oct 2013
4369-v1 OPTIMIZATION OF PARTICLE PRODUCTION FOR A STAGED NEUTRINO FACTORY* Xiaoping Ding et al. Targetry
28 Oct 2013
4355-v2 Use of 325 MHz rf in the Front End David V Neuffer Bunch Coalescing
Proton Driver
Targetry
General
27 Feb 2013
4352-v1 Progress on the Neutrino Factory Target System Design Hisham Kamal Sayed Targetry
General
25 Nov 2012
4337-v1 IDR NEUTRINO FACTORY FRONT END AND VARIATIONS David V Neuffer Targetry
General
25 Jun 2012
4328-v1 GALLIUM AS A POSSIBLE TARGET MATERIAL FOR A MUON COLLIDER OR NEUTRINO FACTORY Xiaoping Ding Targetry
17 May 2012
4327-v1 Mercury Handling for the Target System for a Muon Collider Van B Graves Targetry
17 May 2012
4326-v1 Shielding of Superconducting Coils for a 4-MW Muon Collider Target System Robert J Weggel Targetry
17 May 2012
4325-v1 Energy Flow and Deposition in a 4-MW Muon Collider Target System Nicholas Souchlas Targetry
17 May 2012
4322-v1 Surface Inspection of the MERIT Primary Containment Chamber Van B Graves Targetry
05 Jan 2012
4318-v2 Draft muon collider parameters Robert B Palmer Collider RIng
Proton Driver
Acceleration
Targetry
General
Final Cooling
6D Cooling
16 Dec 2011
4317-v1 Cooling of Shielding with Pressurized Helium Gas Robert J Weggel Targetry
22 Nov 2011
4315-v1 H2 Gas-filled RF Cavities and the Neutrino Factory Front End David V Neuffer Targetry
General
04 Nov 2011
4313-v1 Optimization of a Mercury Jet Target for a Neutrino Factory or a Muon Collider J. Scott Berg et al. Targetry
19 Oct 2011
4310-v1 mu+-mu- Colliders David V Neuffer Collider RIng
Proton Driver
Acceleration
Targetry
General
Final Cooling
6D Cooling
13 Oct 2011

Number of documents found: 16

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

DocDB Version 8.7.23, contact MAP Document Database Administrators
Execution time: 0 wallclock secs ( 0.17 usr + 0.02 sys = 0.19 CPU)