Muon Accelerator Program (MAP)

U.S. Department of Energy

Document List by Topic

These documents on General are available:

MAP-doc-# Title Author(s) Topic(s) Last Updated
4399-v2 The Case for Muon-based Neutrino Beams Alan David Bross et al. General
24 Oct 2014
4402-v1 Revised Completion Plan for the Muon Ionization Cooling Experiment (MICE) at Rutherford Appleton Laboratory Mark A Palmer General
21 Oct 2014
4401-v1 Normal-Conducting RF Cavity R&D at the MuCool Test Area Daniel Bowring et al. General
21 Oct 2014
4400-v1 Fundamental Aspects of Muon Beams Jean-Pierre Delahaye et al. General
21 Oct 2014
4398-v1 Muon Accelerator R&D Issues Mark A Palmer General
21 Oct 2014
4380-v1 A Staged Muon Accelerator Facility for Neutrino and Collider Physics Jean-Pierre Delahaye MASS
General
24 Jul 2014
4362-v1 Partial Return Yoke for MICE Holger Witte General
03 May 2013
4361-v1 Space-Charge Effects on Beam Rotation at the Compressor Ring King Y Ng General
08 Apr 2013
4360-v1 Local Longitudinal Microwave Instability Limits King Y Ng General
08 Apr 2013
4355-v2 Use of 325 MHz rf in the Front End David V Neuffer Bunch Coalescing
Proton Driver
Targetry
General
27 Feb 2013
4358-v1 Computing Eigen-Emittances from Tracking Data Yuri Alexahin General
22 Feb 2013
4352-v1 Progress on the Neutrino Factory Target System Design Hisham Kamal Sayed Targetry
General
25 Nov 2012
4350-v1 RF Systems in a Neutrino Factory J. Scott Berg Acceleration
General
03 Oct 2012
4344-v1 Working Group 7 Summary J. Scott Berg et al. General
30 Jul 2012
4314-v2 Options for Production Staging for a Low Energy Neutrino Factory J. Scott Berg General
27 Jul 2012
4338-v1 DESIGN CONCEPT FOR NU-STORM: AN INITIAL “VERY LOW-ENERGY NEUTRINO FACTORY” Alan David Bross General
25 Jun 2012
4337-v1 IDR NEUTRINO FACTORY FRONT END AND VARIATIONS David V Neuffer Targetry
General
25 Jun 2012
4318-v2 Draft muon collider parameters Robert B Palmer Collider RIng
Proton Driver
Acceleration
Targetry
General
Final Cooling
6D Cooling
16 Dec 2011
4320-v1 Interim Design Report Charles Ankenbrandt et al. General
13 Dec 2011
4316-v1 Configuration of the Muon Collider/Neutrino Factory Front End Harold G Kirk et al. General
14 Nov 2011
4315-v1 H2 Gas-filled RF Cavities and the Neutrino Factory Front End David V Neuffer Targetry
General
04 Nov 2011
4312-v1 Muon Accelerator Program: Accomplishments in FY11 Steve Geer General
14 Oct 2011
4310-v1 mu+-mu- Colliders David V Neuffer Collider RIng
Proton Driver
Acceleration
Targetry
General
Final Cooling
6D Cooling
13 Oct 2011

Number of documents found: 23

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

DocDB Version 8.7.23, contact MAP Document Database Administrators
Execution time: 1 wallclock secs ( 0.30 usr + 0.04 sys = 0.34 CPU)