Muon Accelerator Program (MAP)

U.S. Department of Energy

Muon Accelerator Program Document 4306-v1

Beam Loading Computation for the IDS-NF FFAG

Document #:
MAP-doc-4306-v1
Document type:
Note
Submitted by:
J. Scott Berg
Updated by:
J. Scott Berg
Document Created:
23 Sep 2011, 07:33
Contents Revised:
26 Oct 2010, 10:50
DB Info Revised:
26 Oct 2010, 10:50
Actually Revised:
23 Sep 2011, 10:49
Viewable by:
  • Public document
Modifiable by:
Other Versions:
MAP-doc-4306-v0
23 Sep 2011, 07:33
Abstract:
I accumulate the information we have for the current baseline design for a neutrino factory to determine the maximum current we can expect at the final FFAG accelerating stage. I then determine the energy extracted from the RF cavities in the FFAG, and from that determine how much time there must be between bunch trains to restore the energy to the RF cavities so that each bunch train has the same energy at the storage ring. I also estimate the amount of energy variation from the head to the tail of the bunch train.
Files in Document:
Topics:
Publication Information:
BNL-96364-2011-IR
IDS-NF-AWG-001
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

DocDB Version 8.7.23, contact MAP Document Database Administrators